Albion Pump Station Phases 1 & 2
Project Location:
Maple Ridge, BC
Maple Ridge, BC
The project involved servicing of the initial development of 141 single-family residential lots and servicing options for the larger Albion Neighbourhood (approximately 170 ha). A booster pump station was installed to pump to a reservoir complex. The pump station and reservoir were sized to allow for future development in the service area. The pump station was initially fitted with two 20-HP pumps with the capacity to add two 40-HP pumps in Phase 2. The booster pumps are controlled based on a water level signal from the reservoir.
Municipal Water Systems